One lender requires a rate cap, the other doesn't. Which loan is cheaper?
Price the exact cap the lender requires, project SOFR off the forward curve for both loans, and compare all-in cost under the curve and a few higher-rate scenarios. The tighter margin often loses in the base case and wins in the shocks. In the example, the capped offer wins once SOFR averages above 5.10%. That breakeven assumes SOFR follows today’s forward curve and treats the premium as a cost; the cap’s protection has value of its own.

- $520ka 3-year 5.0% SOFR cap on $50m, upfront, 26 Oct 2026
- 35bpthat premium as a yearly cost over the term
- 25bpmargin gap between the two example offers
- 5.10%average SOFR above which the capped offer wins, in the example
Today, and with BlueGamma
How it usually gets done
- Compare the margins, and leave the cap premium out of the sum.
- Assume SOFR stays where it is for the whole construction loan.
- Wait on a cap quote for one strike, on the provider's timing.
With BlueGamma
- The live premium for the exact cap in the term sheet, and the strikes either side.
- Both loans projected off the same SOFR forward curve, as of the same date.
- One scenario table the people signing off can read, refreshed until you sign.
Not the right fit if the cap is optional and you would never buy one. Then it is a straight margin comparison.
How it works
- 01
Price the cap the lender requires
Enter the notional, term and strike from the term sheet in the cap calculator for the upfront premium. If a higher strike is much cheaper, take that back to the lender.
bluegamma.io/calculators/interest-rate-cap-calculator
- 02
Project SOFR off the forward curve
Pull the SOFR forward curve as of the date the term sheets arrived, in the web app or with the Excel add-in, and project each loan period by period. Same curve, both offers.
app.bluegamma.io/interest-rate-curves/usd/sofr
- 03
Build the scenario table and send it
One row per offer, one column per scenario: the curve, then the curve shifted up 100bp and 200bp. The capped loan is margin plus SOFR up to the strike, plus the premium; the uncapped loan has no ceiling. The table treats the premium as a pure cost on each path, so it leaves out the option value of the protection itself.
Have Claude rebuild it on a schedule through the MCP connector, with one safeguard: if the data didn’t refresh, the table doesn’t go out.
app.bluegamma.io/cap-pricer
In their words
“Say I have a lender that requires me to buy a cap… but another lender doesn't require me to buy that cap. I want to be able to compare the cost of the capital on an effective basis with the rate cap versus without it.”
“You gotta deliver it to them… whether it's a sensitivity table or some kind of scenario analysis… that basically tells them what the cost is, not have them calculate it.”
Your options, compared
Comparing margins alone leaves out the cap and where SOFR is heading. BlueGamma puts the all-in cost of each offer, cap included, in one table.
| Criterion | BlueGamma | Comparing margins only | Spreadsheet with a flat SOFR rate | Cap quote from a provider |
|---|---|---|---|---|
| Does it include the cost of the cap? | Yes, at that strike and the ones either side | No | Only if you get a quote | Yes, for one strike |
| Does it project SOFR properly? | Yes, from the forward curve | No | No, it assumes one flat rate | Not designed for it |
| Can you test higher rates? | Yes, shift the curve and rerun the table | No | Only if you build the scenarios | No |
| Is it easy for the decision-maker to read? | Yes, one table with every offer side by side | Yes, but it's misleading | Depends who built it | No, it's a price, not a comparison |
| Does it stay current until you sign? | Yes, refresh it in Excel or through Claude | No | Only if someone updates it | No, you have to ask again |
Questions teams ask
How do I compare a loan that requires a rate cap with one that does not?
Compare all-in cost, not margin. For the capped loan, add the cap premium to margin plus the projected floating rate, capped at the strike; for the other, project margin plus the floating rate with no ceiling. Then run both under scenarios above the curve, where the cap earns its premium.
How much does a SOFR rate cap cost?
It depends on where the strike sits against the SOFR forward curve, the notional, the term and volatility on the day. On 26 Oct 2026, a 3-year cap on $50m at a 5.0% strike cost about $520k upfront, while a 4.5% strike, nearer the forward curve, cost about $753k. Lenders usually set the strike and term in the term sheet, so the useful number is the live premium for that cap and the strikes either side.
How do I turn a cap premium into a rate I can compare?
Spread the upfront premium over the life of the cap. As a quick check, divide the premium as a percentage of notional by the term in years: a 1% premium on a two-year cap is roughly 50bp a year. For a committee number, discount it against the curve.
Why not just compare the two offers at today’s SOFR?
Because the loan will not pay today’s SOFR for its whole life. On a two- or three-year construction loan, the gap between a flat assumption and the forward curve can be larger than the margin gap between the lenders. Projecting both off the same curve, as of the same date, makes the comparison fair.
Can the comparison be delivered to people who don’t use BlueGamma?
Yes. The people signing off need the answer, not the pricing tool. Build the table in your own workbook with the Excel add-in, or have Claude rebuild it on a schedule through the BlueGamma MCP connector.
Do I need live rates for this, or is end of day enough?
End of day is enough for comparing term sheets: the decision turns on tens of basis points, not the last tick. Live rates matter on the day you actually buy the cap.
Related guides
Put both term sheets through it before you pick one
Price the cap your lender wants, project SOFR for both offers, and see what each one really costs.